CHARACTERISTICS Location: Stalos, Chania Period: February 2017 Duration: 14 days Power: 9.18 kW + 7.02 kW PV Modules: SolarWorld SW 270W Inverter: ABB PVI-10.0-TL + Kostal Piko 7.0 Special Conditions: Limited space for frame installation, requirement to avoid shading from obstacles.
The system was constructed on the roof of a privately owned building as part of the net-metering program for self-generation with energy offset.
info@sarris-energy.gr+30 28210-59825Δ-Π: 8:30πμ – 16:30μμ
Accessibility Tools