CHARACTERISTICS
Location
: General Hospital Agios Georgios, Chania
Period: June 2014
Duration: 30 days
Special Project Conditions: Very limited installation space

General Hospital of Chania

SPECIAL CLOSE CONTROL AIR CONDITIONING

Installation of an Absolute Precision Unit with the capability of maintaining stable temperature conditions (±1.5°C) within the CONTROL ROOM of the Magnetic Resonance Imaging (MRI) throughout the year.

x English Banner
English Popup X

info@sarris-energy.gr
+30 28210-59825
Δ-Π: 8:30πμ – 16:30μμ

SOCIAL MEDIA:

Skip to content