CHARACTERISTICS
Location
: Nerokouro, Chania
Period: March 2018
Duration: 14 days
Power: 15.66 kW
PV Panels: Recom 290-6MB
Inverter: Huawei SUN2000-17KTL
Special conditions of the project: Installation of PV panels on the facade.

PV Mauredakis Security G4S

CONNECTED NET-METERING SYSTEM

The system was installed on the roof and façade of the building at the company’s headquarters, as part of the self-production program with energy offset (net-metering).