CHARACTERISTICS
Location: Nerokouro, Chania Period: March 2018 Duration: 14 days Power: 15.66 kW PV Panels: Recom 290-6MB Inverter: Huawei SUN2000-17KTL Special conditions of the project: Installation of PV panels on the facade.
PV Mauredakis Security G4S
CONNECTED NET-METERING SYSTEM
The system was installed on the roof and façade of the building at the company’s headquarters, as part of the self-production program with energy offset (net-metering).